PERHITUNGAN PEMBEBANAN PLAT

Perhitungan Pembebanan Pelat

A. Data
1) Pada pelat atap :
à Tebal plat atap                                       =   0,100          m
à Tebal finishing                                       =   0,030          m
à Tebal volume hujan                               =   0,030          m
à Berat / volume beton bertulang           =   2400           kg/m3
à Berat / volume beton                             =   2100           kg/m3
à Berat / volume air hujan                        =   1000           kg/m3
à Berat beban bergerak                             =   100             kg/m²
à Berat plafon + penggantung                  =   18               kg/m3

2) Pada pelat lantai :
à Tebal plat lantai                                     =  0,120           m
à Tebal finishing                                       =  0,030           m
à Berat / volume beton bertulang          =  2400            kg/m3
à Berat / volume beton                             =  2100            kg/m3
à Berat / volume air hujan                        =  1000            kg/m3
à Berat beban bergerak                             =   250             kg/m²
à Berat plafon + penggantung                  =   18               kg/m3



B. Pembebanan pelat atap
1) Beban Mati (WD)
à Berat sendiri plat t = 100 mm (0,100 m x 2400Kg/m3)          =  240   Kg/m2
à Berat lapisan kedap air ( 2 x 21 Kg/m2 )                                 =    42   Kg/m2
à Berat Plafon + penggantung = (11+7)Kg/m2                          =    18   Kg/m2   +                                                                                                                                     300   Kg/m2
2)      Beban Hidup ( WL  )                                     
à Beban atap menurut SNI (sesuai kegunaan bangunan)            =  100   Kg/m2
à Berat air hujan 30 mm (0,03 x1000Kg/m3)                             =      30    Kg/m2  +
                                                                                                       =  130   Kg/m2

C. Pembebanan Pelat Lantai 2
1) Beban Mati ( WD )
à Berat sendiri plat t = 120 mm ( 0,120x 2400 )                        288  Kg/m2
à Berat finishing plat 30 mm(0,030 x 2100)                              =    63  Kg/m2 
à Berat keramik                                                                          =    60  Kg/m2 
à Berat Plafon + penggantung = (11+7) Kg/m2                         =    18  Kg/m2 +
                                                                                                      =  429 Kg/m2          
2) Beban Hidup ( WL)
Beban lantai menurut SNI (sesuai kegunaan bangunan)        =     250 Kg/m2



1.1 Penyaluran Beban Mati (WD)
a. Balok Atap
à Balok C1 – C2 = C2 - C3
Q = 2 x 2,000 m x qd atap
= 4 m x 300 kg/m2
= 1200 kg/m
à Balok C3 – C4 = C4 – C5
Q = 2 x 1,800 m x qd atap
= 3.6 m x 300 kg/m2
= 1080 kg/m
b. Balok Lantai 2
à Balok C1 – C2 = C2 - C3
Q = 2 x 2,000 m x qd lantai
= 4 m x 429 kg/m2
= 1716 kg/m
à Balok C3 – C4 = C4 – C5
Q = 2 x 1,800 m x qd lantai
= 3.6 m x 429 kg/m2
= 1545 kg/m

1.2 Penyebaran Beban Hidup (WL)


Balok Atap
à balok C1-C2 = C2-C3
Q = 2 x 2,00m x ql Atap
    = 4 x 130 kg/m2
    = 520 kg/m

à balok C1-C2 = C2-C3
Q = 2 x 1,800 x ql Atap
    = 3.6 x 130 kg/m2
    = 468 kg/m

Balok lantai 2
à balok C3-C4 = C4-C5
Q = 2 x 2,00m x ql lantai
    = 4 x 250 kg/m2
    = 1000 kg/m
à balok C3-C4 = C4-C5
Q = 2 x 1,80m x ql lantai
    = 3.6 x 250 kg/m2
    = 900 kg/m

1.3. Konversi Beban Merata Segitiga Kebeban Merata Persegi Pada Portal
Total beban mati merata persegi dan total beban hidup merata persegi pada plat atap. Beban merata equivalen dengan 0.667 beban segitiga.
Ø Pada balok C1-C2=C2-C3
à  DL    = 1,200 ton/m x 0,667 =  0,801 ton/m
à  LL    = 0,520 ton/m x 0,667 =  0,347 ton/m
Ø Pada balok C3-C4 = C4-C5
à  DL    = 1,080 ton/m x 0,667 =  0,721 ton/m
à  LL    = 0,468 ton/m x 0,667 =  0,313 ton/m

b. Total beban mati merata persegi dan total beban hidup merata persegi pada plat lantai 2 .
Ø Pada balok C1-C2=C2-C3
à  DL  =  1,716 ton/m  x  0,667 = 1,144 ton/m
à  LL   =  1,000 ton/m  x  0,667 = 0,667 ton/m
Ø Pada balok C3-C4 = C4-C5
à  DL    = 1,200 ton/m x 0,667 =  0,801 ton/m
à  LL     = 0,900 ton/m x 0,667  =  0,601 ton/m

1.      Perhitungan Beban Angin
Berdasarkan asumsi kecepatan angin V=100 km/jam = 28 m/s
P=V2/16= 49 kg/m2
Gambar 1.6 Sketsa penyebaran beban angin

à Angin Datang (Tiup)
W1’        = 0,9 (4,00 m x 2,10 m) 49 kg/m2         = 370.44 kg
W2’        = 0,9 (4,00 m x 4,20 m ) 49 kg/m2        = 740.88 kg

à Angin Pergi (Hisap)
W1”       = -0,4 (4,00 m x 2,10 m) 49 kg/m2        = 164.64 kg
W2’        = -0,4 (4,00 m x 4,20 m ) 49 kg/m2      = 329.28 kg
2.      Total Beban Angin
W1 = W1’+W1”            = 370.44 + 164.64       =    535.1 kg
W2 = W2’+W2”            = 740.88 + 329.28       =  1070.2 kg


3. Perhitungan Beban Terpusat
à Pada plat atap
C1 = [(1/2) x 2 m x 2m ]         = 2 m2
C2 = [(1/2) x 2 m x 2m ] x 2   = 4 m2
C3 = [(1/2) x 2 m x 1.8m ]      = 1.8 m2
C4 = [(1/2) x 1.8m x 1.8m ]x2= 3.24 m2
C5 = [(1/2) x 1.8 m x 1.8m ]   = 1.62 m2
à Pada plat lantai 2
C1 = [(1/2) x 2 m x 2m ]         = 2 m2
C2 = [(1/2) x 2 m x 2m ] x 2   = 4 m2
C3 = [(1/2) x 2 m x 1.8m ]      = 1.8 m2
C4 = [(1/2) x 1.8m x 1.8m ]x2= 3.24 m2
C5 = [(1/2) x 1.8 m x 1.8m ]   = 1.62 m2
à Pada balok atap           = (0,250 x 0,300) x 4,00m  x 2400 kg/m3
                                                = 720 kg = 0,720 T

à Pada balok lantai 2      = (0,250x0,280)x4,00x 2400 kg/m3
                                                = 672 kg = 0,672 T
4. Total Beban Terpusat
Ø  Beban Eqivalent dari Atap (1,2,3,4, dan 5) + Berat Balok pada Plat
P1 = [2 x 2 m2 x 0,100m x 2,400 t/m3] + 0,720 ton          =1,680 ton
P2 = [2 x 4 m2 x 0,100m x 2,400 t/m3] + 0,720 ton          = 2,640 ton
P3 = [2 x 1.8 m2 x 0,100m x 2,400 t/m3] + 0,720 ton       = 1.584 ton
P4 = [2 x 3.24 m2 x 0,100m x 2,400 t/m3] + 0,720 ton     = 2,276 ton
P5 = [2 x 1.62 m2 x 0,100m x 2,400 t/m3] + 0,720 ton     = 1.498 ton


Ø  Beban Eqivalent dari Lantai 2 (Balok 1,2,3,4, dan 5) + Berat Balok pada Lantai 2
P1 = [2 x 2m2 x 0,120m x 2,400 t/m3] + 0,672 ton           = 1,824 ton
P2 = [2 x 4m2 x 0,120m x 2,400 t/m3] + 0,672 ton           = 2,976 ton
P3 = [2 x 1.8m2 x 0,120m x 2,400 t/m3] + 0,672 ton        = 1,709 ton
P4 = [2 x 3.24m2 x 0,120m x 2,400 t/m3] + 0,672 ton      = 2,539 ton

·P5 = [2 x 1.62m2 x 0,120m x 2,400 t/m3] + 0,672 ton      = 1,606 ton

5. Penyebaran Beban Merata dan Terpusat Kedalam Bentuk Portal
Gambar 1.7. Hasil Penyebaran Beban Merata dan Beban Terpusat

Comments

  1. Thanks untuk tulisan ini...Keren !!!
    Sangat bermanfaat buat yang membaca.

    ReplyDelete
  2. Jika ingin membuat deck lantai 2, pada lantai 2 akan dibuat kolam renang dengan beban misalkan 70ton air. Pada lantai satu juga akan dibuat sebagai ruang kosong tak ada tiang penyangga tengah. Luasan bentangan 6x12 meter. Profil tanah adalah batu pasir yang sudah keras dan sulit untuk di cangkul, berasal dari letusan pertama kali gunung merapi. Yang ditanyakan:

    1. Berapa dalam plat pondasi yang perlu di gali? Berapa ukuran platnya dan besinya?
    2. Berapa dimensi kolom sloof fsn baloknya?
    3. Berapa ketebalan decknya?

    ReplyDelete
  3. terimakasih sudah berbagi ilmu.sangat bermanfaat.

    ReplyDelete
  4. Terimakasih kembali, semoga bermanfaat

    ReplyDelete

Post a Comment

Popular posts from this blog

Perhitungan Plat Dua Arah

A.     Plat Dua Arah 1.       Tinggi Efektif ; dx = h – P – ½ ∅ Dx                     (arah X) dy = h – P – ∅ Dx – ½ ∅ Dy        (arah Y) 2.       Perhitungan Beban Wu            = 1,2 WD + 1,6 WL. 3.       Perhitungan Momen Mu x               = (koef. Tabel metode amplop berdasarkan Ix/Iy.(Wu.Ix 2 )) Mu y               = (koef. Tabel metode amplop berdasarkan Ix/Iy.(Wu.Ix 2 )) tabel koefisien Momen (Gidion kusuma) 4.       Rasio Tulangan (ρ) : ρ min = 0,0025 (Koefisien CUR pelat) Ketentuan: ρ min < ρ analisa < ρ max Dimana Jika ρ anl < ρmin maka ρ pakai ρ min Jika ρ anl > ρmaks maka ρ pakai ρ maks 5.       ρ analisa Kemudian gunakan rumus ABC Ketentuan SKSNI ‘22 Ø  = faktor reduksi kekuatan 0.80 untuk beban letur tanpa aksial 0.80 untuk aksil tarik da aksial tarik dengan beban lentur 0.65 untuk aksial tekan dan aksial tekan dengan bebean lentur 0.60 untuk lintang dan

Perhitungan Plat Satu Arah

I.        Perhitungan Tulangan Plat Ketentuan: Suatu plat dikatakan Plat Satu Arah jika ly/lx > 2 Suatu plat dikatakan Plat Dua Arah jika ly/lx ≤ 2 Syarat – syarat Bentang : ly = Bentang terpanjang lx = Bentang terpendek. A.     Plat Satu Arah 1.       Tinggi Efektif ; dx = h – P – ½ ∅ Dx                     (arah X) dy = h – P – ∅ Dx – ½ ∅ Dy        (arah Y) 2.       Perhitungan Beban Wu            = 1,2 WD + 1,6 WL. 3.       Perhitungan Momen Mu x               = 1/8 Wu lx 2 Mu y            = 1/8 Wu ly 2 4.       Rasio Tulangan (ρ) : ρ min = 0,0025 (Koefisien CUR pelat) Ketentuan SKSNI 91’ Ketentuan: ρ min < ρ analisa < ρ max Dimana Jika ρ anl < ρmin maka ρ pakai ρ min Jika ρ anl > ρmaks maka ρ pakai ρ maks 5.       ρ analisa Kemudian gunakan rumus ABC Ketentuan SKSNI ‘22 Ø  = faktor reduksi kekuatan 0.80 untuk beban letur tanpa aksial 0.80 untuk aksil tarik da aksi